Difference between revisions of "Fish Protection System (induced drift application)"
Jump to navigation
Jump to search
Bendikhansen (talk | contribs) |
Bendikhansen (talk | contribs) |
||
Line 1: | Line 1: | ||
[[file:icon_downstream.png|right|150px|link=[[Downstream fish migration]]]] | [[file:icon_downstream.png|right|150px|link=[[Downstream fish migration]]]] | ||
{{Note|This technology has been enhanced in the FIThydro project! See [[Innovative technologies from FIThydro]] for a complete list.|reminder}} | {{Note|This technology has been enhanced in the FIThydro project! See [[Innovative technologies from FIThydro]] for a complete list.|reminder}} | ||
+ | '''Note: This article will be finished with the submission of deliverable 3.3 and 3.4 in October, 2020''' | ||
=Introduction= | =Introduction= | ||
Revision as of 11:58, 30 September 2020
This technology has been enhanced in the FIThydro project! See Innovative technologies from FIThydro for a complete list.
Note: This article will be finished with the submission of deliverable 3.3 and 3.4 in October, 2020
Contents
Introduction
Methods, tools, and devices
During planning
During implementation
During operation
Relevant MTDs and test cases
Relevant measures | |
---|---|
N/A | |
Relevant test cases | Applied in test case? |
Altheim test case | - |
Altusried test case | - |
Anundsjö test case | - |
Bannwil test case | - |
Bragado test case | - |
Gotein test case | - |
Guma and Vadocondes test cases | - |
Günz test case | - |
Ham test case | - |
Las Rives test case | - |
Schiffmühle test case | - |
Trois Villes test case | - |
Classification table
- N/A
- N/A
- N/A
Classification | Selection |
---|---|
Fish species for the measure | 0 |
Does the measure require loss of power production | - |
- | |
- | |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
- | |
- | |
- | |
Which physical parameter is addressed | - |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | - |
- | |
Section in the regulated system measure is designed for | - |
- | |
- | |
- | |
River type implemented | - |
- | |
- | |
Technology readiness level | TRL 8: system complete and qualified |
Cost of solution | See cost table |