Difference between revisions of "Template:Skimming wall (fixed or floating)"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Updating classification tables: minor changes) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 24: | Line 24: | ||
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]] | ||
|- | |- | ||
− | |rowspan = "8"|Which physical parameter is | + | |rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::N/A]] |
|- | |- | ||
||- | ||- | ||
Line 54: | Line 54: | ||
||- | ||- | ||
|- | |- | ||
− | |rowspan = "3"|River type implemented|| | + | |rowspan = "3"|River type implemented||- |
|- | |- | ||
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]] | ||
Line 62: | Line 62: | ||
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] | ||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] | ||
|- | |- | ||
− | ||Technology readiness level||[[Technology readiness level::TRL | + | ||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]] |
|} | |} |
Latest revision as of 12:21, 2 July 2020
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Never |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
- | |
- | |
Movements of migration of fish | |
Which physical parameter is addressed | N/A |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | - |
Upstream of hydropower plant | |
- | |
- | |
River type implemented | - |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |