Difference between revisions of "Template:Placement of spawning gravel in the river"

From FIThydrowiki
Jump to navigation Jump to search
(Updating classification tables: Adding FIThydro colors)
(Updating classification tables: minor changes)
Line 1: Line 1:
 
{| class="wikitable"
 
{| class="wikitable"
! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Placement of spawning gravel in the river
 
|-
 
 
! Classification !! Selection
 
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||[[Fish species for the measure::Gravel spawners]]
+
|Fish species for the measure||[[Fish species for the measure::0]]
 
|-
 
|-
 
|rowspan = "3"|Does the measure require loss of power production||-
 
|rowspan = "3"|Does the measure require loss of power production||-
Line 14: Line 12:
 
||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]]
 
||Recurrence of maintenance||[[Recurrence of maintenance::Less often than yearly]]
 
|-
 
|-
|rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
+
|rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 +
|-
 +
||-
 +
|-
 +
||-
 
|-
 
|-
 
||-
 
||-
Line 22: Line 24:
 
||-
 
||-
 
|-
 
|-
|rowspan = "8"|Which physical parameter is addressed||-
+
|rowspan = "8"|Which physical parameter is mitigated||-
 
|-
 
|-
 
||-
 
||-
Line 28: Line 30:
 
||-
 
||-
 
|-
 
|-
||[[Which physical parameter is addressed::Substrate and hyporheic zone]]
+
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]]
 
|-
 
|-
 
||-
 
||-
Line 46: Line 48:
 
|rowspan = "4"|Section in the regulated system measure is designed for||-
 
|rowspan = "4"|Section in the regulated system measure is designed for||-
 
|-
 
|-
||-
+
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]]
 
|-
 
|-
 
||[[Section in the regulated system measure is designed for::Bypass section]]
 
||[[Section in the regulated system measure is designed for::Bypass section]]
Line 52: Line 54:
 
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
|-
 
|-
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
+
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]

Revision as of 12:13, 2 July 2020

Classification Selection
Fish species for the measure 0
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Less often than yearly
Which life-stage of fish is measure aimed at Spawning / Recruitment
-
-
-
-
-
Which physical parameter is mitigated -
-
-
Substrate and hyporheic zone
-
-
-
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Bypass section
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
-
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment