Difference between revisions of "Template:Fact box for Guma and Vadocondes"
Jump to navigation
Jump to search
(Creating templates for test-case fact-boxes) |
Bendikhansen (talk | contribs) m (Text replacement - "³" to "<sup>3</sup>") |
||
(10 intermediate revisions by 2 users not shown) | |||
Line 18: | Line 18: | ||
|- | |- | ||
| Inter-annual discharge | | Inter-annual discharge | ||
− | | 17.6 | + | | 17.6 m<sup>3</sup>/s |
|- | |- | ||
| Turbine(s) | | Turbine(s) | ||
| 2 Kaplan turbines at each HPP | | 2 Kaplan turbines at each HPP | ||
+ | |- | ||
+ | | Detailed report | ||
+ | |[[:file:testcase_presentation_Guma and Vadocondes.pdf|Click for pdf]] | ||
|} | |} |
Latest revision as of 10:21, 21 February 2020
Fact box: Guma and Vadocondes | |
---|---|
Country | Spain |
River | Duero |
Operator | SAVASA |
Capacity | Guma: 2.25 MW, Vadocondes: 1 MW |
Head | Guma: 8.85 m, Vadocondes: 3.75 m |
Inter-annual discharge | 17.6 m3/s |
Turbine(s) | 2 Kaplan turbines at each HPP |
Detailed report | Click for pdf |