Difference between revisions of "Template:Fact box for Guma and Vadocondes"
Jump to navigation
Jump to search
Bendikhansen (talk | contribs) |
Bendikhansen (talk | contribs) |
||
Line 24: | Line 24: | ||
|- | |- | ||
| Detailed report | | Detailed report | ||
− | |[[file:testcase_presentation_Guma and Vadocondes.pdf|Click for pdf]] | + | |[[:file:testcase_presentation_Guma and Vadocondes.pdf|Click for pdf]] |
|} | |} |
Revision as of 08:39, 27 January 2020
Fact box: Guma and Vadocondes | |
---|---|
Country | Spain |
River | Duero |
Operator | SAVASA |
Capacity | Guma: 2.25 MW, Vadocondes: 1 MW |
Head | Guma: 8.85 m, Vadocondes: 3.75 m |
Inter-annual discharge | 17.6 m³/s |
Turbine(s) | 2 Kaplan turbines at each HPP |
Detailed report | Click for pdf |