Difference between revisions of "Freudenau test case"
Jump to navigation
Jump to search
Bendikhansen (talk | contribs) |
Bendikhansen (talk | contribs) |
||
Line 24: | Line 24: | ||
| - | | - | ||
|} | |} | ||
+ | |||
+ | {{Relevant SMTDs for Freudenau}} | ||
=Introduction= | =Introduction= |
Revision as of 09:37, 21 January 2020
Fact box: Freudenau | |
---|---|
Country | Austria |
River | Danube |
Operator | VERBUND |
Capacity | 172 MW |
Head | 8.6 m |
Inter-annual discharge | 3000 m³/s |
Turbine(s) | - |