Difference between revisions of "Template:Skimming wall (fixed or floating)"
Jump to navigation
Jump to search
(Updating classification tables: minor formatting fix) |
(Updating classification tables: Adding FIThydro colors) |
||
Line 1: | Line 1: | ||
{| class="wikitable" | {| class="wikitable" | ||
+ | ! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Skimming wall (fixed or floating) | ||
+ | |- | ||
! Classification !! Selection | ! Classification !! Selection | ||
|- | |- |
Revision as of 14:35, 16 January 2020
Skimming wall (fixed or floating) | |
---|---|
Classification | Selection |
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
Movements and migration of fish | |
Which physical parameter is addressed | Barriers |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 8: system complete and qualified |