Difference between revisions of "Template:Fish lifts, screws and locks"
Jump to navigation
Jump to search
(Updating classification tables: changing available parameters) |
(Updating classification tables: Adding FIThydro colors) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{| class="wikitable" | {| class="wikitable" | ||
+ | ! colspan="2" style="text-align: center; background-color:#2cb4da; color:#ffffff;" |Fish lifts, screws and locks | ||
+ | |- | ||
! Classification !! Selection | ! Classification !! Selection | ||
|- | |- | ||
Line 20: | Line 22: | ||
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]] | ||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]] | ||
|- | |- | ||
− | |rowspan = " | + | |rowspan = "8"|Which physical parameter is addressed||[[Which physical parameter is addressed::Barriers]] |
|- | |- | ||
||- | ||- | ||
Line 36: | Line 38: | ||
||- | ||- | ||
|- | |- | ||
− | |rowspan = "2"|||[[Hydropower type the measure is suitable for::Plant in dam]] | + | |rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] |
|- | |- | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] |
Latest revision as of 14:35, 16 January 2020
Fish lifts, screws and locks | |
---|---|
Classification | Selection |
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
Movements and migration of fish | |
Which physical parameter is addressed | Barriers |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | In dam/power plant |
- | |
- | |
- | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very uncertain |
Technology readiness level | TRL 7: system prototype demonstration in operational environment |