Difference between revisions of "Template:Removal of debris"

From FIThydrowiki
Jump to navigation Jump to search
(Created blank page)
 
(Updating classification tables: changing available parameters)
Line 1: Line 1:
 
+
{| class="wikitable"
 +
! Classification !! Selection
 +
|-
 +
|Fish species for the measure||[[Fish species for the measure::All]]
 +
|-
 +
|rowspan = "3"|Does the measure require loss of power production||-
 +
|-
 +
||-
 +
|-
 +
||[[Does the measure require loss of power production::Structural (requires no additional flow release)]]
 +
|-
 +
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 +
|-
 +
|rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Juveniles]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 +
|-
 +
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
 +
|-
 +
|rowspan = "9"|Which physical parameter is mitigated||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||-
 +
|-
 +
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]]
 +
|-
 +
||[[Which physical parameter is mitigated::Water temperature]]
 +
|-
 +
||[[Which physical parameter is mitigated::Ice]]
 +
|-
 +
||[[Which physical parameter is mitigated::Water velocity]]
 +
|-
 +
||[[Which physical parameter is mitigated::Water depth]]
 +
|-
 +
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 +
|-
 +
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 +
|-
 +
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 +
|-
 +
|rowspan = "4"|Section in the regulated system measure is designed for||-
 +
|-
 +
||[[Section in the regulated system measure is designed for::Upstream of hydropower plant]]
 +
|-
 +
||[[Section in the regulated system measure is designed for::Bypass section]]
 +
|-
 +
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 +
|-
 +
|rowspan = "3"|River type implemented||[[River type implemented::Steep gradient (up to 0.4 %)]]
 +
|-
 +
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 +
|-
 +
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 +
|-
 +
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]]
 +
|-
 +
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 +
|}

Revision as of 14:58, 13 January 2020

Classification Selection
Fish species for the measure All
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
Movements and migration of fish
Which physical parameter is mitigated -
-
-
-
Substrate and hyporheic zone
Water temperature
Ice
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Moderately certain
Technology readiness level TRL 9: actual system proven in operational environment