Difference between revisions of "Template:Placement of stones in the river"

From FIThydrowiki
Jump to navigation Jump to search
(Making templates for classification tables)
(Updating classification tables: changing available parameters)
Line 12: Line 12:
 
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]]
 
|-
 
|-
|rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
+
|rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (0+)]]
+
||[[Which life-stage of fish is measure aimed at::Juveniles]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (1+)]]
+
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (older than 1+)]]
+
||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]]
|-
 
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
 
|-
 
|-
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
+
|rowspan = "9"|Which physical parameter is mitigated||-
 
|-
 
|-
|rowspan = "8"|Which physical parameter is mitigated||-
+
||-
 
|-
 
|-
 
||-
 
||-

Revision as of 14:58, 13 January 2020

Classification Selection
Fish species for the measure Gravel spawners
Does the measure require loss of power production -
-
Structural (requires no additional flow release)
Recurrence of maintenance Irregular at events
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juveniles
Adult fish
Movements and migration of fish
Which physical parameter is mitigated -
-
-
-
Substrate and hyporheic zone
-
-
Water velocity
-
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
Upstream of hydropower plant
Bypass section
Downstream outlet
River type implemented Steep gradient (up to 0.4 %)
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
-
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment