Difference between revisions of "Template:Off-channel reservoir storage"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Updating classification tables: changing available parameters) |
||
Line 12: | Line 12: | ||
||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] | ||
|- | |- | ||
− | |rowspan = " | + | |rowspan = "4"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]] |
|- | |- | ||
− | ||[[Which life-stage of fish is measure aimed at:: | + | ||[[Which life-stage of fish is measure aimed at::Juveniles]] |
|- | |- | ||
− | ||[[Which life-stage of fish is measure aimed at:: | + | ||[[Which life-stage of fish is measure aimed at::Adult fish]] |
|- | |- | ||
− | ||[[Which life-stage of fish is measure aimed at:: | + | ||[[Which life-stage of fish is measure aimed at::Movements and migration of fish]] |
− | |||
− | |||
|- | |- | ||
− | || | + | |rowspan = "9"|Which physical parameter is mitigated||- |
|- | |- | ||
− | + | ||- | |
|- | |- | ||
||- | ||- |
Revision as of 14:58, 13 January 2020
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juveniles | |
Adult fish | |
Movements and migration of fish | |
Which physical parameter is mitigated | - |
- | |
- | |
- | |
Substrate and hyporheic zone | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Higher than 10 |
Section in the regulated system measure is designed for | - |
- | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
- | |
- | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |