Difference between revisions of "Template:Drawdown reservoir flushing"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Making templates for classification tables) |
||
Line 4: | Line 4: | ||
|Fish species for the measure||[[Fish species for the measure::All]] | |Fish species for the measure||[[Fish species for the measure::All]] | ||
|- | |- | ||
− | |rowspan = "3"|Does the measure require loss of power production|| | + | |rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]] |
|- | |- | ||
||- | ||- | ||
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
− | ||Recurrence of maintenance||[[Recurrence of maintenance:: | + | ||Recurrence of maintenance||[[Recurrence of maintenance::Irregular at events]] |
|- | |- | ||
|rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]] | |rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]] | ||
Line 32: | Line 32: | ||
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]] | ||[[Which physical parameter is mitigated::Substrate and hyporheic zone]] | ||
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
||- | ||- | ||
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] | |rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]] | ||
Line 44: | Line 44: | ||
||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||[[Hydropower type the measure is suitable for::Plant with bypass section]] | ||
|- | |- | ||
− | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for:: | + | ||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::Higher than 10]] |
|- | |- | ||
|rowspan = "4"|Section in the regulated system measure is designed for||- | |rowspan = "4"|Section in the regulated system measure is designed for||- | ||
Line 56: | Line 56: | ||
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]] | |rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]] | ||
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
− | || | + | ||- |
|- | |- | ||
||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] | ||Level of certainty in effect||[[Level of certainty in effect::Moderately certain]] |
Revision as of 10:12, 28 October 2019
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
- | |
- | |
Recurrence of maintenance | Irregular at events |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juvenile habitat (0+) | |
Juvenile habitat (1+) | |
Juvenile habitat (older than 1+) | |
Adult fish | |
Movements of migration of fish | |
Which physical parameter is mitigated | - |
- | |
- | |
Substrate and hyporheic zone | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Higher than 10 |
Section in the regulated system measure is designed for | - |
- | |
Bypass section | |
Downstream outlet | |
River type implemented | Bypass section |
- | |
- | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |