Difference between revisions of "Template:Construction of off-channel habitats"
Jump to navigation
Jump to search
(Making templates for classification tables) |
(Making templates for classification tables) |
||
Line 32: | Line 32: | ||
||[[Which physical parameter is mitigated::Substrate and hyporheic zone]] | ||[[Which physical parameter is mitigated::Substrate and hyporheic zone]] | ||
|- | |- | ||
− | || | + | ||[[Which physical parameter is mitigated::Water temperature]] |
|- | |- | ||
− | || | + | ||[[Which physical parameter is mitigated::Ice]] |
|- | |- | ||
||[[Which physical parameter is mitigated::Water velocity]] | ||[[Which physical parameter is mitigated::Water velocity]] | ||
Line 52: | Line 52: | ||
||[[Section in the regulated system measure is designed for::Bypass section]] | ||[[Section in the regulated system measure is designed for::Bypass section]] | ||
|- | |- | ||
− | || | + | ||[[Section in the regulated system measure is designed for::Downstream outlet]] |
|- | |- | ||
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]] | |rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]] |
Revision as of 10:12, 28 October 2019
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | - |
- | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Less often than yearly |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juvenile habitat (0+) | |
Juvenile habitat (1+) | |
Juvenile habitat (older than 1+) | |
Adult fish | |
Movements of migration of fish | |
Which physical parameter is mitigated | - |
- | |
- | |
Substrate and hyporheic zone | |
Water temperature | |
Ice | |
Water velocity | |
Water depth | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | - |
- | |
Bypass section | |
Downstream outlet | |
River type implemented | Bypass section |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Moderately certain |
Technology readiness level | TRL 9: actual system proven in operational environment |