Difference between revisions of "Template:Tester"

From FIThydrowiki
Jump to navigation Jump to search
m (Bendikhansen moved page Tester to Template:Tester)
 
(24 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
=Intro=
 +
=check=
 +
=Check=
 
{| class="wikitable"
 
{| class="wikitable"
! Classification !! Mitigating reduced annual flow and low flow measures
+
! Classification !! Selection
 
|-
 
|-
|Fish species for the measure||All[[Fish species for the measure::All]]
+
|Fish species for the measure||[[Fish species for the measure::All]]
 
+
|-
 +
|rowspan = "3"|Does the measure require loss of power production||[[Does the measure require loss of power production::Operational (requires flow release outside turbine)]]
 +
|-
 +
||[[Does the measure require loss of power production::Operational (requires flow release through turbine)]]
 +
|-
 +
||-
 
|-
 
|-
|rowspan = "3"|Does the measure require loss of power production?||Operational (requires flow release outside turbine)
+
||Recurrence of maintenance||[[Recurrence of maintenance::Never]]
 
|-
 
|-
|Operational (requires flow release through turbine)
+
|rowspan = "6"|Which life-stage of fish is measure aimed at||[[Which life-stage of fish is measure aimed at::Spawning / Recruitment]]
 
|-
 
|-
|
+
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (0+)]]
 
|-
 
|-
|rowspan = "6"|Which life-stage of fish is measure aimed at?||Spawning / Recruitment
+
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (1+)]]
 
|-
 
|-
||Juvenile habitat (0+)
+
||[[Which life-stage of fish is measure aimed at::Juvenile habitat (older than 1+)]]
 
|-
 
|-
||Juvenile habitat (1+)
+
||[[Which life-stage of fish is measure aimed at::Adult fish]]
 
|-
 
|-
||Juvenile habitat (older than 1+)
+
||[[Which life-stage of fish is measure aimed at::Movements of migration of fish]]
 
|-
 
|-
||Adult fish
+
|rowspan = "8"|Which physical parameter is mitigated||-
 
|-
 
|-
||Movements of migration of fish
+
||-
 
|-
 
|-
|rowspan = "7"|Which physical parameter is mitigated?||
+
||-
 
|-
 
|-
||
+
||-
 
|-
 
|-
||
+
||-
 
|-
 
|-
||
+
||-
 
|-
 
|-
||
+
||[[Which physical parameter is mitigated::Water velocity]]
 
|-
 
|-
||Water velocity
+
||[[Which physical parameter is mitigated::Water depth]]
 
|-
 
|-
||Water depth
+
|rowspan = "2"|Hydropower type the measure is suitable for||[[Hydropower type the measure is suitable for::Plant in dam]]
 
|-
 
|-
|rowspan = "2"|Hydropower type the measure is suitable for||Plant in dam
+
||[[Hydropower type the measure is suitable for::Plant with bypass section]]
 
|-
 
|-
||Plant with bypass section
+
||Dam height (m) the measure is suitable for||[[Dam height (m) the measure is suitable for::All]]
 
|-
 
|-
||Dam height [m] the measure is suitable for||All
+
|rowspan = "4"|Section in the regulated system measure is designed for||-
 
|-
 
|-
|rowspan = "3"|Section in the regulated system measure is designed for||
+
||-
 
|-
 
|-
||Bypass section
+
||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
||Downstream outlet
+
||[[Section in the regulated system measure is designed for::Downstream outlet]]
 
|-
 
|-
|rowspan = "3"|River type implemented||Steep gradient (> 0.4 %)
+
|rowspan = "3"|River type implemented||[[Section in the regulated system measure is designed for::Bypass section]]
 
|-
 
|-
||Fairly steep with rocks, boulders (< 0.4; > 0.05 %)
+
||[[River type implemented::Fairly steep with rocks, boulders (from 0.4 to 0.05 %)]]
 
|-
 
|-
||Slow flowing, lowland, sandy (< 0.05 %)
+
||[[River type implemented::Slow flowing, lowland, sandy (less than 0.05 %)]]
 
|-
 
|-
||Level of certainty in effect||Very certain
+
||Level of certainty in effect||[[Level of certainty in effect::Very certain]]
 
|-
 
|-
||Technology readiness level||TRL 9: actual system proven in operational environment
+
||Technology readiness level||[[Technology readiness level::TRL 9: actual system proven in operational environment]]
 
|}
 
|}
 +
 +
=Doubletester=

Latest revision as of 13:29, 25 October 2019

Intro

check

Check

Classification Selection
Fish species for the measure All
Does the measure require loss of power production Operational (requires flow release outside turbine)
Operational (requires flow release through turbine)
-
Recurrence of maintenance Never
Which life-stage of fish is measure aimed at Spawning / Recruitment
Juvenile habitat (0+)
Juvenile habitat (1+)
Juvenile habitat (older than 1+)
Adult fish
Movements of migration of fish
Which physical parameter is mitigated -
-
-
-
-
-
Water velocity
Water depth
Hydropower type the measure is suitable for Plant in dam
Plant with bypass section
Dam height (m) the measure is suitable for All
Section in the regulated system measure is designed for -
-
Bypass section
Downstream outlet
River type implemented Bypass section
Fairly steep with rocks, boulders (from 0.4 to 0.05 %)
Slow flowing, lowland, sandy (less than 0.05 %)
Level of certainty in effect Very certain
Technology readiness level TRL 9: actual system proven in operational environment

Doubletester