Difference between revisions of "Template:Tester"
Jump to navigation
Jump to search
Bendikhansen (talk | contribs) |
Bendikhansen (talk | contribs) |
||
Line 1: | Line 1: | ||
+ | =Intro= | ||
{| class="wikitable" | {| class="wikitable" | ||
! Classification !! Selection | ! Classification !! Selection |
Revision as of 13:23, 25 October 2019
Intro
Classification | Selection |
---|---|
Fish species for the measure | All |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
Operational (requires flow release through turbine) | |
- | |
Recurrence of maintenance | Never |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juvenile habitat (0+) | |
Juvenile habitat (1+) | |
Juvenile habitat (older than 1+) | |
Adult fish | |
Movements of migration of fish | |
Which physical parameter is mitigated | - |
- | |
- | |
- | |
- | |
- | |
Water velocity | |
Water depth | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | All |
Section in the regulated system measure is designed for | - |
- | |
Bypass section | |
Downstream outlet | |
River type implemented | Bypass section |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain |
Technology readiness level | TRL 9: actual system proven in operational environment |