Template:Removal of debris
Jump to navigation
Jump to search
- N/A
- N/A
- N/A
Classification | Selection |
---|---|
Fish species for the measure | 0 |
Does the measure require loss of power production | - |
- | |
- | |
Which life-stage of fish is measure aimed at | - |
- | |
- | |
- | |
- | |
- | |
Which physical parameter is addressed | - |
- | |
- | |
- | |
- | |
- | |
- | |
- | |
Hydropower type the measure is suitable for | - |
- | |
Section in the regulated system measure is designed for | - |
- | |
- | |
- | |
River type implemented | - |
- | |
- | |
Technology readiness level | TRL 8: system complete and qualified |
Cost of solution | See cost table |