Classification table
Jump to navigation
Jump to search
This is the full list of potential inputs to the classification tables used for the various mitigation measures
Full list of classification table answers | |
---|---|
Classification | Selection (multiple) |
Fish species for the measure | Single or groups of fish species in Europe |
Does the measure require loss of power production | Operational (requires flow release outside turbine) |
Operational (requires flow release through turbine) | |
Structural (requires no additional flow release) | |
Recurrence of maintenance | Never |
Daily | |
Weekly | |
Yearly | |
Less often than yearly | |
Irregular at events | |
Which life-stage of fish is measure aimed at | Spawning / Recruitment |
Juveniles | |
Adult fish | |
Movements and migration of fish | |
Which physical parameter is addressed | Barriers |
Flow quantity | |
Flow variations | |
Substrate and hyporheic zone | |
Water temperature | |
Ice | |
Water velocity | |
Water depth | |
Hydropower type the measure is suitable for | Plant in dam |
Plant with bypass section | |
Dam height (m) the measure is suitable for | Up to 10 |
Up to 20 | |
Up to 50 | |
Higher than 10 | |
All | |
Section in the regulated system measure is designed for | In dam/power plant |
Upstream of hydropower plant | |
Bypass section | |
Downstream outlet | |
River type implemented | Steep gradient (up to 0.4 %) |
Fairly steep with rocks, boulders (from 0.4 to 0.05 %) | |
Slow flowing, lowland, sandy (less than 0.05 %) | |
Level of certainty in effect | Very certain |
Moderately certain | |
Uncertain | |
Very uncertain | |
Technology readiness level | TRL 1: basic principles observed |
TRL 2: technology concept formulated | |
TRL 3: experimental proof of concept | |
TRL 4: technology validated in lab | |
TRL 5: technology validated in relevant environment) | |
TRL 6: technology demonstrated in relevant environment) | |
TRL 7: system prototype demonstration in operational environment | |
TRL 8: system complete and qualified | |
TRL 9: actual system proven in operational environment |